Salkhit wind
Salkhit wind · Chinneeb · CC BY-SA 4.0 · Wikimedia Commons

Where the power
comes from.

2025

Electricity supply · 2025Made in Mongolia: 9,911.9 GWh. Imported: 2,700.5 GWh. Supply, not consumption. Totals are rounded. Ribbon width follows generated energy.Thermal9,034.3GWhWind532.6GWhSolar288.7GWhHydro56.2GWhImported2,700.5GWhElectricity supply12,612.5GWh · 2025
Ribbon width follows generated energy. Too small to draw: Diesel 0.1 GWh.

New projects
planned and under construction.

Funding128

Selected projects, ordered by reported capacity.

Stations & development86

76 mapped · 10 location pending · Location not stated: 6

About the data

What this atlas does not cover yet.

This research edition is not a complete national census. Local heat, captive generation, ownership and site locations are still being reconciled.

41Stations
45Development
41mapped

Energy records: 162 · Support packages: 10 · Scope undisclosed: 1 · In provinces: 154 · Several provinces: 1 · Nationwide: 2 · Location not stated: 16

How to read the atlas

  1. MW is capacity. GWh is energy produced over a year.
  2. Storage uses both MW and MWh. Heat and grid infrastructure use different measures.
  3. Programmes, work packages and plant phases overlap. Their counts and budgets are not additive.
  4. Operating is a reported lifecycle stage, not a claim of live output.

A green dot is a station that already stands. A blue ring is development that does not. Positions are candidate site locations and exact sites are still being verified. A group shows how many records sit together, not their combined capacity. A station never groups with development, so a group keeps one colour. Stages inside a group can differ. Province shading counts the records filed there, including those with no point on the map. Reported project stages. Planned capacity is not electricity being produced. Photographs show the named stations. A new project that is not built yet shows its site, the plant it expands or the builder’s drawing, and the caption says which. Each picture carries its author and licence.

Source directory

Ministry of Energy

  1. 1Foreign-funded portfolio
  2. 2Private / PPP portfolio
  3. 32026 state-budget portfolio
  4. 4Public dispatch snapshot
  5. 5State Commission acceptance register
  6. 6Sukhbaatar CHP first fire and revised target
  7. 7Ten-province heat programme: suspension and Korean financing
  8. 8CHP3 capacity and refurbishment update
  9. 9Commissioned components of the ADB renewable programme
  10. 10Five central-grid solar plus BESS auction sites
  11. 11Western and eastern solar plus BESS EOI
  12. 12Mandalgovi 100 MW wind IPP EOI
  13. 13Gobi Lot 1 / Mandalgovi prequalification deadline update
  14. 14Eldev 100 MW wind plant groundbreaking (AB Solar Wind Choir project)
  15. 15Gobi renewable supply auction at Oyu Tolgoi / Zes Oyu
  16. 16Khootiin mine proposed 300 MW plant
  17. 17Egiin Gol studies and 2026 work
  18. 18Public tender list, including distributed soum systems

Energy Regulatory Commission

  1. 19Energy Statistics 2025
  2. 20Linked license register PDF
  3. 21License register landing page
  4. 22Energy Regulatory Commission: construction licence for the Myangad solar plant

Development banks

  1. 23ADB Upscaling Renewable Energy Sector project 50088-002
  2. 24ADB Songino BESS operational account
  3. 25EBRD Tsetsii wind project 47949
  4. 26EBRD Sainshand wind project 47397
  5. 27EBRD account of Salkhit and Tsetsii
  6. 28World Bank approval of Fourth Energy Sector Project

Registers and datasets

  1. 29OpenStreetMap Mongolia power-plant features
  2. 30Moncement captive solar and battery environmental record
  3. 31Ukhaa Khudag operator capacity and operations
  4. 32Global Energy Monitor integrated power tracker
  5. 33Environmental Information Centre project assessments
  6. 34NSO annual electricity balance table
  7. 35Public procurement invitations and awards

News reports

  1. 36MNB: power purchase agreements signed with the five central-grid solar plus BESS auction winners
  2. 37Ugluu.mn: winners and tariffs of the first renewable auction, citing mongolia.gov.mn

Other sources

  1. 38MONTSAME: western hydro and solar stations merged into Taishir Green Energy
  2. 39MONTSAME: Moncement waste heat recovery generating unit
  3. 40Government of Mongolia: Nalaikh heat plant capacity and its replacement
  4. 41MONTSAME: Uliastai heat station construction start
  5. 42Ikon.mn: Arvaikheer heat station construction start
  6. 43Dardas: Sukhbaatar and Khentii heat station groundbreaking
  7. 44MONTSAME: Bayankhongor heat station construction start
  8. 45Erdene solar plant environmental record

Research · 19 Sep 2026 · v2026-09-19.1